Skip to content

Deliverables

GANTT

BoM bill of materials

"Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua."

Materials

Qty Description Price Link Notes
1 PLA 22.00 $ http://amazon.com/test IN STOCK
2 Velostat 22.00 $ http://amazon.com/test
1 Material three 22.00 $ http://amazon.com/test packs of 3
1 Material five 22.00 $ http://amazon.com/test timing
5 Material eight 22.00 $ http://amazon.com/test
10 Material twelve 22.00 $ http://amazon.com/test
10 Material eleven 22.00 $ http://amazon.com/test

Slide show

Embed your presentation

Unable to display PDF file. Download instead.

Story telling script

My sketches for the story telling session tell a story about my concept and lead to the final outcome in..


  • scene 1 the scene opens with a room full of flowers
  • scene 2 we zoom into the lady wearing a plant based dress



- scene 3 she comes out from behind the plants


- scene 4 ... whats next?


A good exaple of story telling sketches are from ...Florencia Moyano https://class.textile-academy.org/2022/florencia-moyano/finalproject/prefinal03/

"Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum."

This model 1 was obtained by.. Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Code Example

The code below was created in partnership with Grecia Bello (see her work).

// the setup function runs once when you press reset or power the board
void setup() {
  // initialize digital pin LED_BUILTIN as an output.
  pinMode(LED_BUILTIN, OUTPUT);
}

// the loop function runs over and over again forever
void loop() {
  digitalWrite(LED_BUILTIN, HIGH);   // turn the LED on (HIGH is the voltage level)
  delay(1000);                       // wait for a second
  digitalWrite(LED_BUILTIN, LOW);    // turn the LED off by making the voltage LOW
  delay(1000);                       // wait for a second
}

How-Tos & Tutorials

Upload templates or tutorials you created for your personal project, it can also be links to instructables when the project is educational, protocols when working with growing materials and so on..

---

Fabrication files


  1. File: 3d modelling of mannequin ↩

  2. File: Laser cut sheets ↩