Deliverables
1. GANTT
2. BoM bill of materials
| Qty | Description | Price | Link | Notes |
|---|---|---|---|---|
| 1 | Material one | 22.00 $ | http://amazon.com/test | order soon |
| 2 | Material two | 22.00 $ | http://amazon.com/test | |
| 1 | Material three | 22.00 $ | http://amazon.com/test | packs of 3 |
| 1 | Material five | 22.00 $ | http://amazon.com/test | timing |
| 5 | Material eight | 22.00 $ | http://amazon.com/test | |
| 10 | Material twelve | 22.00 $ | http://amazon.com/test | |
| 10 | Material eleven | 22.00 $ | http://amazon.com/test |
3. Slide show
4. Story telling script
5. FINAL FABRICATION FILES
5.1 How-Tos & Tutorials
Text here with optional 1 references 2