Deliverables

GANTT

The following Gantt graph contains the tasks and timeline to complete them

Gantt Graph

Flowcharts

Flowchart


BoM Bill of Materials

"Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua."

Materials

Qty Description Price (USD) Link Notes
1 GSR sensor 16.00 $ https://aliexpress.com/ ordered
1 MAX30102 03.00 $ https://mercadolibre.com
2 Xiao Esp32C3 20.00 $ http://aliexpress.com/ ordered
1 Lipo battery 05.00 $ http://mercadolibre.com/
1 Neoprene 22.00 $ http://amazon.com/
1 Conductive thread 08.00 $ http://amazon.com/
10 Wires, Jumpers 06.00 $ http://steren.com/
1 Breadboard 07.00 $ http://steren.com/

Tools

- Cautin and welding
- Snap pliers and snaps
- Scissors
- Laser cutting machine
- Fabric: neoprene, lycra and velcro
- 3D printer
- Sewing machine, steamer
- 22 gauge wire
- Thread
- Conductive thread

Slide show

Embed your presentation

Project Proposal presentation

Unable to display PDF file. Download instead.

Midterm presentation

Unable to display PDF file. Download instead.

Storytelling review presentation

Unable to display PDF file. Download instead.

Story board

How-Tos & Tutorials

Introducción a la Serie Seeed Studio XIAO ESP32S3

Getting started with XIAO-ESP32-S3-Sense

Getting Started With ESP32-C3 XIAO

Install Silicon Labs CP210x USB to UART Bridge driver on Windows to fix Arduino Ide Port Problems

Etextile VR Gloves for Vive Tracker

FABRICATION FILES

Hand

GLove pattern

Heart box

Heart box cover

ESP Receiver box

ESP Receiver cover

Battery box

Battery box cover